一品威客小姐全国信息论坛_寻凤楼论坛_嘉兴喝茶品茶工作室_一品阁qm论坛官网入口

Home Collection ContactWelcome to visitSHANDONG QINGXIN MACHINERY TECHNOLOGY CO.LTD

庆昕机械

QINGXIN MACHINERY

English
中文版

Service Hotline:86-536-6638777Provide products and solutions

Position: Home > Industry information > Preparation of the twin-screw extruder before driving

Preparation of the twin-screw extruder before driving

Source: Time: 2018/11/17 13:49:09
Experts from the twin-screw extruder service provider Nanjing Jieente Electromechanical Co., Ltd. said that for the meshing early twin-screw extruder, be careful not to mistake the position of the two screws when loading the screw. If the material is added after the vehicle is added, the material will not be transported forward at the feeding port, the screw head will be on the machine head, and the current will increase. When such a situation occurs, stop immediately, remove the machine head, and reload in the correct position. . Before driving, check whether the circuit wiring of each part of the machine is correct; whether the cooling system of the barrel screw is normal and unblocked; whether the drive system is normal, whether the lubricating oil level is normal, whether the oil circuit is unblocked, whether the metering and exhaust system is normal; Whether the connecting bolts are tightened, etc.
Single screw granulator service provider experts said that for pellets, the feed should be metered to prevent overload; for powder, overflow feed can be used, pay close attention to whether it is overloaded. When driving, add a small amount of material and keep the balance of the feed. At this time, pay close attention to the torque gauge pointer. The main screw speed should be rotated at a low speed. When the material is extruded from the die and the traction device is introduced, the screw speed is gradually increased, and then the feeding amount is increased until the set value is reached.
Experts from Nanjing Jie Ente Electromechanical Co., Ltd. said that the feeding was stopped before stopping, and the screw of the main machine was running at a low speed to discharge the materials in the screw. For the counter-rotating twin-screw, when the standby head no longer has material discharge, remove the machine head, pull out the screw, clean the screw, the machine head and the barrel, and then assemble and reset, and use it for the next drive. If a special cleaning material is used, it is not necessary to pull out the screw for cleaning. Normally, maintenance and maintenance should also be carried out. If empty car operation is not allowed, the screw and barrel should not be worn. If the operation is not normal, stop immediately to check and repair; prevent metal or other debris from falling into the hopper.

Tel

86-536-6638777
主站蜘蛛池模板: 获嘉县| 慈溪市| 六枝特区| 惠来县| 博乐市| 襄城县| 九江市| 彭水| 东至县| 汉阴县| 海口市| 南陵县| 塔城市| 华池县| 洛南县| 苗栗县| 岐山县| 且末县| 和静县| 惠东县| 白山市| 丘北县| 仙居县| 新疆| 宝清县| 绿春县| 商洛市| 买车| 行唐县| 泰安市| 连城县| 宿松县| 通化县| 洛隆县| 泾川县| 福建省| 民丰县| 长宁区| 来宾市| 元朗区| 枣强县|